Skip to main content

typography

Typography 

Pre-Production

Finding quotes for this project was fairly easy. I have the Pinterest app and look at quotes daily. I was very excited when I found out we were doing this project because I love quotes. The hardest part was only being able to pick four quotes because I like too many. I spent around two days looking on Pinterest and safari narrowing down which quotes to use. The next step was to choose fonts for all of the quotes, I went on da font.com to find them. I wanted simple fonts for most of my quotes and fancier more complex fonts for the more important words in the quote.

Production

Working on illustrator was easier now that we have done many projects on and it is later in the year. The only tricky part about putting the quotes together on illustrator was figuring out where to put the certain words in the quote. For some of the quotes I wanted the focus to be on the fonts so I didn't want to do too much with the formation of the words. Working without color was easier than working with color. For me picking colors was like picking fonts. It took a long time and it was hard to find multiple colors that went good together. While working with black and white I only had to focus on the font and the layout.

Post-Production    

I think that my final products turned out really well. I love all of the quotes that I ended up choosing to use. I also think that I did a good job of having the important words of the quote pop out more than the other words in the quote.  I also think that the colors that I used compliment each other very well. 















Comments

Popular posts from this blog

final blog

graphic design final reflection blog One of my favorite parts about graphic design was making the vector illustrator portrait. For this project we had to choose an image of ourselves, a family member, or a family pet. We then had to choose if we wanted to do an organic vector which is tracing the facial features on the objects face or a low poly geometric vector which is when you make lots of different and tiny triable on the subject. I chose to do the low poly geometric because I felt it would look better on my dog. It took me around two weeks to complete this project. I was gone towards the end of the first week, if I wasn't gone I most likely would have finished the project sooner. I faced a few challenges along the way. At the very beginning of the project I didn't know how big to make the triangles. I decided to do small triangles on my dogs features and bigger triangles on my dogs body. Another challenge I faced was having all of my triangles looking very similar whic

ab sequence

In this project we learned even more about using the six shots while filming. This video could be longer than the video we filmed for the creating a document, so we had a lot more time. Since we had more time we had to switch our angle of the shot more often. Because if you watched a video and all the shots were taken at the same angle it would be boring. In this project we had our character going all over the place where in the other one our character was only in the library. So we had more action in this video which was much more fun to film! When me and my other three partners were brainstorming and sketching for this project we had so many ideas that it was hard to narrow it down to one big idea! The first and biggest thing we had to figure out was where our characters would end up. Because we didn't want to be on one side of the school then have to find enough stopping points to get to the other side of the school and still have the viewer know where we were going.  We edi

movie trailer blog post

movie trailer blog post   the project process When we were assigned this project we were asked to pick a high school movie trailer and make one recreating it. My group and I decided to re create the breakfast club movie trailer. We thought it would be fairly easy because most of the video takes place in a school library and the rest in the school hallways. We had to plan out filming and planning days for the project which is something my group and I didn't do well on. The next step was to story board, we had to go through the whole movie trailer and describe and sketch out each frame. When it was finally time to film it was very close to spring break, we had two days of school left and we planned to film all of our footage in those days. Unfortunately we didn't get much done those days, the footage we did get had actors that dropped out so we couldn't't use any of it. When we came back from break we took around a couple of days to find more actors. The actors we